This is an old revision of the document!
Warning: Trying to access array offset on null in /home/especiais/epsatisep/public_html/2020/EPS2020-wiki3/lib/plugins/caption/syntax/reference.php on line 68
Warning: Undefined array key "tlabel1" in /home/especiais/epsatisep/public_html/2020/EPS2020-wiki3/lib/plugins/caption/syntax/reference.php on line 68
Warning: Undefined array key "tlabel3" in /home/especiais/epsatisep/public_html/2020/EPS2020-wiki3/lib/plugins/caption/syntax/reference.php on line 68
Warning: Undefined array key "tlabel4" in /home/especiais/epsatisep/public_html/2020/EPS2020-wiki3/lib/plugins/caption/syntax/reference.php on line 68
Table of Contents
Work plan
Deadlines
- 2020-02-24 Choose a project proposal and send your choice via email to epsatisep@gmail.com
- 2020-03-05 Define the Project Backlog (what must be done and key deliverables - every member should preferably participate in every task), Global Sprint Plan, Initial Sprint Plan (which tasks should be included, who does what) and Release Gantt Chart of the project and insert them on the wiki (planning)
- 2020-03-10 Upload the “black box” System Diagrams & Structural Drafts to the wiki
- 2020-03-27 Upload the detailed System Schematics, Structural Drawings & 3D Modelation to the wiki and do the cardboard scale model of the structure
- 2020-03-01 Upload the List of Materials (what & quantity) to the wiki
- 2020-03-03 Upload the Interim Report and Presentation to the wiki. The report must contain the the following chapters: Introduction, Project Management, State of the Art, Marketing Plan, Eco-efficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography. In particular, the Project Management chapter includes the updated project progress register, the sprint report for completed sprints (tasks that were included, statuses, assignees, allocations) and the updated release Gantt chart
- 2020-04-16 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks
- 2020-04-23 Upload the List of Materials (provider, price, quantity, including VAT and transportation) to the wiki
- 2020-04-30 Upload the Final video of the 3D Model to the wiki
- 2020-05-06 Upload Refined Interim Report (based on Teacher & Supervisor Feedbacks) to the wiki
- 2020-05-13 Upload Packaging solution to the wiki
- 2020-06-02 Upload the results of the (Prototype or Simulation) Functional Tests to the wiki
- 2020-06-12 Upload the Final Report, Presentation, Video, Paper, Poster and Manual to the wiki
- 2020-06-16 Final Presentation, Individual Discussion and Assessment
- 2020-06-19:
- Update the wiki, report, paper with all suggested corrections
- Hand in to the EPS coordinator:
- a pendrive with the refined deliverables (source + PDF) together with all code, drawings and models produced
- a printed copy of the final report, poster, brochure and leaflet
- 2020-06-23:
- Demo of prototype or 3D model, simulation and companion applications
- Hand-in the user manual
- Receive the EPS@ISEP certificate
- Bring typical food from your country
Project Plan
Define your optimal sprint duration and plan your sprints until project end using Global Sprint Plan Table 1.
Table 1: Global Sprint Plan
| Sprint | Start | Finish |
|---|---|---|
| 1 | 20.02.2020 | 26.02.2020 |
| 2 | 27.02.2020 | 04.03.2020 |
| 3 | 05.03.2020 | 11.03.2020 |
| 4 | 12.03.2020 | 18.03.2020 |
| 5 | 19.03.2020 | 25.03.2020 |
| 6 | 26.03.2020 | 01.04.2020 |
| Easter Holiday | ||
| 7 | 09.04.2020 | 15.04.2020 |
| 8 | 16.04.2020 | 22.04.2020 |
| 9 | 23.04.2020 | 29.04.2020 |
| Students Week | ||
| 10 | 07.05.2020 | 13.05.2020 |
| 11 | 14.05.2020 | 20.05.2020 |
| 12 | 21.05.2020 | 27.05.2020 |
| 13 | 28.05.2020 | 03.06.2020 |
| 14 | 04.06.2020 | 10.06.2020 |
| 15 | 11.06.2020 | 17.06.2020 |
| 16 | 18.06.2020 | 23.06.2020 |
Build your project backlog, including all relevant tasks/deliverables, using Project Backlog Table 2. Prioritize all backlog items (PBI), keeping higher priority items at the top, and lower priority at the bottom.
Table 2: Project Backlog
| PBI | Title | Status |
|---|---|---|
| A | State of the Art | To do |
| D | Structural Drafts | To do |
| M | Updating Gantt Chart | To do |
| F | Name and Logo | To do |
| H | Market Research | To do |
| G | Project Management | To do |
| I | Ecological Research | To do |
| J | List of Materials | To do |
| O | Ethics | To do |
| E | Interim Report | To do |
| B | Project Planning | To do |
| K | Functional Tests | To do |
| L | Final Report | To do |
| C | Black Box | Done |
| N | Impement Design Thinking | Done |
Plan each sprint at its beginning (Sprint Planning session) using the Sprint Plan Table 3.
Table 3: Sprint Plan
| Sprint | Task | Duration (d) | Responsible | Involved |
|---|---|---|---|---|
| 1 | B | 5 | Lore | Jelte, Andreea |
| 1 | C | 1 | Jelte and Andreea | / |
| 1 | D | 7 | Andreea, Lore | Gabriel |
| 1 | N | 2 | Jelte | / |
| 1 | A | 7 | Jelte | Lore, Andreea, Gabriel, Eduardo |
| 1 | M | 5 | Lore | Jelte |
| 1 | H | 10 | Vladimir | Gabriel, Jelte |
| 1 | F | 5 | Andreea | / |
| 1 | G | 7 | Jelte | Eduardo, Vladimir |
| 1 | I | 7 | Jelte | Gabriel |
| 1 | O | 7 | Lore, Andreea | Eduardo |
Review each sprint at its end and update each item status on the Progress Register Table 4.
Table 4: Project Progress Register
| Sprint | PBI | Responsible | Involved | Status |
|---|---|---|---|---|
| 1 | B | Lore | Jelte, Andreea | Done |
| 1 | C | Jelte and Andreea | / | Done |
| 1 | D | Gabriël | Lore, Andreea | In progress |
| 1 | A | Jelte | Andreea, Lore, Gabriël, Eduardo | In progress |
| 1 | B | Jelte | / | In progress |
| 1 | M | Lore | Jelte | In progress |
Gantt Chart