EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

report [2020/06/23 08:24] – [5 Eco-efficiency Measures for Sustainability] team3report [2021/03/23 11:23] (current) – external edit 127.0.0.1
Line 2102: Line 2102:
 Chapter 6 shows the ethical and deontological concerns that the team took into account while developing the shelters. Chapter 6 shows the ethical and deontological concerns that the team took into account while developing the shelters.
 ===== - Ethical and Deontological Concerns ===== ===== - Ethical and Deontological Concerns =====
 +
  
 ==== - Introduction ====  ==== - Introduction ==== 
Line 2219: Line 2220:
  
 ===== - Project Development ===== ===== - Project Development =====
 +
  
 ==== - Introduction ==== ==== - Introduction ====
Line 3016: Line 3018:
 In the next chapter, is described the future development and a discussion that will present the conclusions and prospective the team drew during this project, so the team will discuss aspects related to the product, limitations, requirements, and results obtained. \\ In the next chapter, is described the future development and a discussion that will present the conclusions and prospective the team drew during this project, so the team will discuss aspects related to the product, limitations, requirements, and results obtained. \\
 ===== - Conclusions ===== ===== - Conclusions =====
 +
 ==== - Discussion ==== ==== - Discussion ====
  
QR Code
QR Code report (generated for current page)