| Line 85: | Line 85: | ||
| ==== 15th Week Report (25.05 - 31.05.2020) ==== | ==== 15th Week Report (25.05 - 31.05.2020) ==== | ||
| + | The time of this week was spent on doing the simulations in solidworks, analyzing the results of it and searching for solutions to make the shelter better. There is worked on the maquette, the final video and poster were finished, the marketing chapter was improved, the final version of the leaflet and flyer were uploaded, a final conclusion was written about the project and the paper was edited. | ||
| ==== 16th Week Report (01.06 - 07.06.2020) ==== | ==== 16th Week Report (01.06 - 07.06.2020) ==== | ||
| + | The time of this week is used to finish the manual and poster, to add the last details to the CAD file, to make the last simulations and to describe the results of it. The new results were analyzed, and the limitations of our model were discussed. Also solutions and future research were defined. The scale model was finished, such as the paper. A full check was done on the report to check if everything was finished and correct. We started to make the final presentation. | ||
| + | A meeting was done with the communication teacher to get feedback about our poster and manual. | ||
| ==== 17th Week Report (08.06 - 14.06.2020) ==== | ==== 17th Week Report (08.06 - 14.06.2020) ==== | ||
| + | This week finalized the last things and made the presentation. All deliverables were uploaded and the final presentation was done. | ||
| - | |||
| - | ==== 18th Week Report (15.06 - 21.06.2020) ==== | ||
| - | |||
| - | |||
| - | ==== 19th Week Report (22.06 - 28.06.2020) ==== | ||
| - | |||
| - | |||
| - | //Fill in with a short description of your activities during this week// | ||
| ===== Meetings ===== | ===== Meetings ===== | ||
| Line 317: | Line 311: | ||
| === Agenda: === | === Agenda: === | ||
| - Outer fabric layer that provides better ventilation | - Outer fabric layer that provides better ventilation | ||
| - | - Folding | + | - Folding |
| - Simulation | - Simulation | ||
| - Database website | - Database website | ||
| Line 324: | Line 318: | ||
| === Minute: === | === Minute: === | ||
| - | Starting with the database website, Benedita advised us to use the free software that allows us to use it for one month. So we can show it at least during the final presentation. Concerning the outer layer fabric the supervisors were very excited as this was a good solution for the roof and will work as an insulation layer. As the simulations still weren' | + | Starting with the database website, Benedita advised us to use the free software that allows us to use it for one month. So we can show it at least during the final presentation. Concerning the outer layer fabric, the supervisors were very excited as this was a good solution for the roof and will work as an insulation layer. As the simulations still weren' |
| ==== 15th Meeting (2020-06-04) ==== | ==== 15th Meeting (2020-06-04) ==== | ||
| === Agenda: === | === Agenda: === | ||
| - | - Simulation | + | |
| + | | ||
| - Maquette-work in progress | - Maquette-work in progress | ||
| - | - | ||
| - | |||
| + | Powerpoint about what we did this week:\\ | ||
| + | {{ : | ||
| === Minute: === | === Minute: === | ||
| + | During this meeting all dimensions of the shelter were showed so we could explain clearly which dimensions were important while doing the simulations. The required forces on the shelter were listed up to explain how the simulations were done and the results of the simulations were discussed. According to the simulations, | ||
| + | Regarding the paper, we were advised to include personal outcomes of all our group members. In this outcomes we have to describe our EPS experience and the experience of doing a project on long distance. | ||
| Line 341: | Line 338: | ||
| ==== 16th Meeting (2020-06-09) ==== | ==== 16th Meeting (2020-06-09) ==== | ||
| === Agenda: === | === Agenda: === | ||
| - | - | + | - Video |
| + | - Poster | ||
| + | - Simulations | ||
| + | - Tracking Application | ||
| + | - Are fabrication drawings for the parts required? | ||
| + | - How long is the final presentation supposed to be? | ||
| === Minute: === | === Minute: === | ||
| + | The final video, tracking app and poster were showed. We received some feedback about the volume of the video which we have to improve. The last changes have to be made for the poster, including change the title to a better position. For the simulations an individual meeting between one of the supervisors and one of the members was scheduled to refine and finalize the tests. Feedback about the paper was given as well. | ||